Overview
In 1981 Lothian Regional Council acquired various disused lines and other railway land, making possible the creation of cycleways-cum-footpaths. The programme began in 1983 and has flourished ever since. More might have been achieved had the line closures of the 1960s been accompanied by comprehensive plans for re-utilisation, which the mood of the times did not favour. There was instead piecemeal redevelopment for domestic housing, commerce and industry. Although a more enlightened policy subsequently prevailed, these results are not easily undone.
Nevertheless, the maze of track beds has very largely been preserved covering a total of some 40 miles. Thirteen walks are described and, although each stands alone, tackling them in sequence opens windows on two centuries of urban expansion which has subsumed once-independent communities, all with their own histories.
Select a Delivery Option
1 Item Added to Bag 1 Item Added to Pickup